Türkçe
Skip Navigation Links
Main Page
Company ProfileExpand Company Profile
Online TransactionsExpand Online Transactions
Data BankExpand Data Bank
DirectoratesExpand Directorates
AnnouncementsExpand Announcements
CommunicationExpand Communication
Click to see programmed power outages because of continuing maintenance business for providing better service to you  
Electricity Lines are locating underground  at Anatolian side  Click for more

Our appropriation of the year 2010 for 97% of the investments were used.

2010 year investment fund is 53.928.095 TL. It has been a successful period of study and appropriation 52,311,641 TL a pretty high as using the percentage of 97% occurrence is provided.

 

16  substation  converted   from 10KV to  35KV.

 Because of not to provide the system load increases of 10 kV network, 16  substation  converted   from 10KV to  35KV. In this study we removed a total of 14.75 MVA power transferred from 10 kV to 35 kV network.In addition,during studies transformer substations have been revisions in terms of equipment and buildings.

 

(Image)

81 new substations has been installed.

 In order to meet the energy demands of new subscribers and the voltage drop in the regions to address this problem,the total installed capacity of 64.69 MVA 81 new substation was established.

 

(Image)

 

194,257 meters of high voltage underground electricity cable has been installed.

 

The new high-voltage substations to the network contacts, improvement of high-voltage network,due to the economic life of the building completed and the rapidly growing energy transmission lines in the city's up and threatening to transform the underground electric cable, a total of 15 companies in our region 194,257 meters of high voltage underground electricity cables have been installed.

(Image)

 

191,448 meters, low voltage underground electricity cable has been installed. 

New substations of contacts with low-voltage network, low voltage problems in the areas of partial elimination of this problem, threatening the economic life of the overhead lines underground, to be completed and existing subscribers,191,448 meters low voltage underground electricity cable, have been installed. to meet increasing load demands at 15 companies in our region

 

(Image)

 

Lighting plant was made 451 pieces of galvanized steel pole.

 

The total 451 pieces of galvanized pole lighting facility  were made to clarify lighting is poor and the newly opened roads.

 

(Image)


Skip Navigation Links
Payment Points
Invoice Details
New Subscription
New Contract
Cancellation of Contract
Find Qualified Plumber
Frequently Asked Questions
Power Outages
Bid Announcements

 
Corporation E-Mail
Click For All Announcements.
Useful Links
AYEDAŞ  İstanbul Anatolian Side Electricity Distribution Corp. 
Bağlarbaşı District Refahevler st. No:2/1 Maltepe / İSTANBUL
Telephone : 0216 457 49 00-19 (20 lines) - 0216 457 48 20-26 (7 lines)
Since date of  01.01.2011 person visited our site.